PFLNG SATU
PETRONAS’s first floating liquefied natural gas (FLNG) facility, also known as PFLNG Satu, was developed for the Kanowit gas field off the coast of Sarawak in Malaysia. It is the world’s first operational FLNG facility.
PFLNG Satu was constructed in South Korea and the facility was towed to its first location, 180 km offshore of Bintulu in May 2016 and successfully achieved first gas on 14 November 2016.
After 3 successful years at the Kanowit gas field in Sarawak, with 19 LNG loading operations completed, on 12 March 2019 PFLNG Satu has been relocated to the Kebabangan Cluster field in Sabah and she is permanently moored at the new location.
She is 365 m long and weighs approximately 125,000 t when fully loaded. She is the first FLNG project to use the dual row cargo containment system, which enables the cryogenic storage tanks to be tolerant to sloshing within the hull.
- Vessel Name
PFLNG Satu - Field Name
Kebabangan Cluster Field - Location
Kebabangan Cluster Field in Sabah, East Malaysia - Water Depth
120m
Copyright © 2017 FPSO Ventures Sdn. Bhd.(622961-W). All rights reserved.